ISG
TERMS OF REFERENCE
(Final Version for 2003-2005)
INTRODUCTION
The International
Support Group (ISG) was established in 1997 in accordance with Decision
No. 541 NN/TCCB-QD on 9th April 1997 with advisory function in the
effective use of ODA resources. The focus of ISG was then on forestry.
However, a review was undertaken in 1999. The review recommended
widening the scope of ISG to include more sectors and activities
than forestry. A new set of ToRs was therefore developed for the
period 2000 to 2002 and it was decided to fund ISG activities through
a Trust Fund arrangement to which donors could contribute funds.
The present ISG Trust Fund was established in accordance with Decision
No 1167/CP-QHQT dated 18th December 2000 by the Government and extended
until 31 December 2005 by Decision No 4299/VPCP-QHQT dated 5th August
2002 issued by the Government.
ISG reports
to MARD Minister via the Director General of the International Cooperation
Department (ICD), who is also the Director of ISG Secretariat. The
present hierarchical composition of the four ISG bodies is: ISG
Plenary, ISG Steering Board, Thematic Ad-hoc Groups (TAGs) and ISG
Secretariat.
ISG has since
establishment provided significant support to MARD generally and
ICD specifically. Efforts have been geared towards; (i) dissemination
of information, (ii) coordination with donors and within MARD, (iii)
policy dialogue and (iv) preparation of workshops, seminars and
(v) other activities.
However given
new policies, priorities and strategies to address present development
challenges, opportunities and constraints faced by the agricultural
and rural sector in Vietnam, the present review has been undertaken
(April/May 2003) to up-date and revise the ToRs for the ISG.
This review
concludes that the ISG has achieved commended results and that ISG's
scope of work being further widened to meet the current needs and
challenges. It is in particular found that ISG should assist MARD,
ICD with coordination and policy dialogue at horizontal and vertical
levels during all levels of the project cycle: identification through
to impact evaluation and dissemination of lessons learned.
Below
are ISG steering documents in details:
- 144 Kb
ISG Terms of Reference 2003-2005
- 80 Kb
ISG Operational Plan 2003-2005
- 86 Kb
ISG Proposed budget 2003-2005
The
previous version of ISG ToR
|